Please see below for a list of road construction projects and events that are expected to have an impact on traffic flow next week; including notice from Public Works & Government Services Canada (PWGSC) for overnight closures of the La Salle Causeway.

See the entire 2011-2014 infrastructure program at www.cityofkingston.ca/construction

For updates on Highway 401 construction visit the Ministry of Transportation's website at www.roadinfo.mto.gov.on.ca or call 5-1-1.

Road Closures

  • Chelsea Road will be closed from Belmont to Cranbrook beginning Monday, Sept. 9 until mid-November.
  • Division Street will be closed from Raglan to Elm until mid-September
  • Kirkpatrick Street will be closed between Kingscourt and Brant until late September.

Traffic Delays

  • Expect delays at the intersection of Division and Earl while crews install sidewalk ramps and four-way stop control beginning Monday, September 9 until early October.
  • Division Street (Perth Road) will experience minimal delays at the intersection of MacAdoo's Lane until mid-September while crews from the Ministry of Transportation install new traffic signals.
  • Glengarry will experience delay until late September for resurfacing.
  • Bayridge Drive will experience delays from Amberdale to Princess until mid-October for road improvements and resurfacing.
  • Taylor Kidd Boulevard will also experience delays at the intersection of Bayridge Drive until mid-October for road improvements and resurfacing.
  • Expect delays at the intersection of Princess Street and Westbrook Road until mid-October while crews construct intersection improvements.
  • Expect delays at the intersection of King Street and Trailhead until mid-October while crews construct intersection improvements.
  • Expect delays on Princess Street at the Collins Bay/Cataraqui Woods Drive intersection until late September while crews construct the intersection and traffic signals.
  • Bayridge Drive will experience delays between Cedarwood and Peachwood until mid-September while crews install infrastructure for the Cataraqui Woods Drive extension.

Bus Detours

Bookmark this site for the latest Kingston Transit bus detours www.CityofKingston.ca/busdetours.


Lasalle Causeway—Overnight Road Closures

KINGSTON, Ontario, September 10, 2013 – Public Works and Government Services Canada (PWGSC) wishes to advise motorists and pedestrians of overnight closures on the LaSalle Causeway taking place during weeknights until September 20, 2013, from 12:01 a.m. to 6:00 a.m. The Causeway will remain open to emergency vehicles. Marine traffic will not be affected. The Causeway will be closed to pedestrians during this time.

These closures are required to accommodate a series of precise measurements of the lift bridge in various lift positions. Four additional rounds of measurements will be conducted over the next several months and will be announced in advance. The schedule may change due to inclement weather or logistical requirements.

Safety is a top priority for PWGSC and we are committed to ensuring the continued integrity of the bridges we manage. We apologize for any inconvenience these closures may cause and thank everyone for their understanding.

Further information on the project schedule can be found on the LaSalle Causeway web page at http://www.tpsgc-pwgsc.gc.ca/ontario/lasalle-eng.html.

Fermetures Nocturnes Du Pont-Jetée LaSalle

Kingston (Ontario), le 10 septembre 2013 – Travaux publics et Services gouvernementaux Canada (TPSGC) souhaite aviser les conducteurs et les piétons des fermetures nocturnes du pont-jetée LaSalle qui auront lieu en semaine jusqu'au 20 septembre 2013, de 0 h 1 (minuit) à 6 h. Le pont jetée restera ouvert aux véhicules d'urgence. Le trafic maritime ne sera pas touché. Le pont-jetée sera fermé à la circulation piétonne.

Ces fermetures doivent avoir lieu pour permettre des mesurages précis du pont-jetée à différentes positions de levage. Quatre autres séries de mesurages seront effectuées au cours des prochains mois et elles seront annoncées à l'avance. Le calendrier pourrait changer en raison de mauvaises conditions météorologiques ou d'exigences logistiques.

La sécurité est la principale priorité de TPSGC, et le Ministère s'engage à assurer l'intégrité continue des ponts qu'il gère. Nous nous excusons pour tout inconvénient que ces fermetures pourraient vous occasionner et nous vous remercions de votre compréhension.

Vous pouvez trouver de plus amples renseignements sur le calendrier du projet à la page Pont-jetée Lasalle à http://www.tpsgc-pwgsc.gc.ca/ontario/lasalle-fra.html

FOR FURTHER INFORMATION, PLEASE CONTACT:

Dan Joyce
Asset Manager, Engineering Assets, Ontario Region
416-512-5962

Media Relations, Ontario Region
Public Works and Government Services Canada
416-512-5550

POUR PLUS DE RENSEIGNEMENTS, VEUILLEZ COMMUNIQUER AVEC :

Dan Joyce
Gestionnaire des biens, Ouvrages techniques, région de l'Ontario
416-512-5962

Relations avec les médias, région de l'Ontario Travaux publics et Services gouvernementaux Canada
416-512-5550

Suivez-nous sur Twitter à http://twitter.com/TPSGC_PWGSC.
Follow us on Twitter at http://twitter.com/PWGSC_TPSGC.


 

- 30 -

For more information about City projects contact Cindie Ashton, Communications Officer 613-546-4291, extension 3116. Or call the City of Kingston's media hotline at 613-546-4291, ext. 2300.

Connect to your City.

Twitter: follow @CityofKingston
Facebook: Like us at www.facebook.com/TheCityofKingston
www.CityofKingston.ca
Information Radio: 106.3 FM
613-546-0000